Expandable Container House for Global Projects

Factory-direct expandable, folding, flat-pack and detachable container houses for camps, site offices, accommodation, resorts and emergency projects.

Start Your Modular Building Project

Modular Housing Specialist

Factory-direct container building systems for camps, offices and accommodation projects.

About LUMOND

Building Modular Spaces Through Factory Strength

Lumin Mod provides modular container building solutions for overseas project buyers, contractors, distributors and camp operators. From expandable houses and folding rooms to flat-pack systems and detachable modules, we help customers choose the right structure, layout and loading plan before production.

Our Best-selling Products

Double-Wing Expandable Container Houses for Fast-Deploy Living and Project Spaces

2016
Founded

Stable production experience for modular building projects

7
Production Bases

Coordinated factory capacity for repeat orders and project supply

200000m²
Factory Area

Large-scale workshops for modular housing manufacturing

300000+
Annual Capacity

Capacity support for standard and customized units

Request A Factory-Direct Modular House Consultation

Send your project size, use scenario and destination country. Our team will recommend the right building system, layout and loading plan.

Our Solutions

Modular Building Systems For Camps, Offices And Living Spaces

Choose from multiple building systems designed for different site conditions, budgets and delivery requirements. Lumin Mod supports standard models, custom layouts, interior finish packages and export-ready loading.
7+
Building Systems

Expandable, folding, flat-pack, detachable and custom modular options

Fast Deployment

Expandable and folding units help projects create usable space quickly on site.

Factory Customization

Layouts, panels, doors, windows, flooring and electrical options can be quoted by project.

Modular Building Systems Designed For Project Use

Match the product type to your transport plan, site installation conditions and final use. Our team helps compare structure, layout and finishing options before quotation.
Double-Wing Extendable Houses

Expandable side wings create larger usable space after delivery, making them suitable for accommodation, offices, retail spaces and flexible project layouts.

Folding Prefabricated Houses

Foldable structures help reduce transport volume and support fast on-site deployment for temporary facilities, camps and repeat-use projects.

Quick-Mount Prefabricated Houses

Transport-efficient components for practical on-site assembly, suitable for project camps, offices, accommodation blocks and repeatable buildings.

Space Capsule Houses

Modern modular pods designed for glamping, resorts, scenic destinations and premium outdoor accommodation projects with a distinctive visual appeal.

Containerized Prefabricated Houses

Container-based modular units for site offices, worker accommodation, commercial spaces and multi-unit camp projects with flexible layout options.

Custom Modular Solutions

Share your application, dimensions, layout and destination country. We can develop a modular building solution around your project requirements.

7+

Production Bases

Factory Strength

Modular Building Excellence Supported By Factory Capacity

With large-scale production bases, experienced workers and export project experience, Lumin Mod supports buyers from product selection and drawings to production, inspection, packing and shipment.

Production Capacity
95%
Customization Flexibility
92%
Export Packing Experience
94%
Project Response Speed
90%
Choose LUMOND

Why Global Buyers Work With LUMOND

Factory-Direct Pricing

No trader layer. Quotes come from the team connected to production.

01
Custom Layout Options

Room layout, openings, panels, flooring and electrical scope can be matched to your project.

02
Export-Ready Delivery

Packing and loading plans are prepared for overseas shipment.

03
Quality-Controlled Production

Materials, structure and finished units are checked before loading.

04
Our Company

From Factory Production To Overseas Project Delivery

Lumin Mod focuses on integrated modular housing solutions for project buyers worldwide. Our product range covers expandable container houses, folding houses, corrugated folding houses, flat-pack container houses, detachable container houses and customized one-stop living spaces.

Founded in 2016, the production network covers modern factory bases with large-scale manufacturing capacity for modular housing projects.

Expandable, folding, flat-pack, detachable, prefab steel and custom modular systems are available for different budgets and site needs.

Exterior color, wall panels, flooring, doors, windows, furniture, kitchen, sanitary ware and electrical supply can be configured before production.

Plan Your Modular Building Project With Lumin Mod

Tell us your application, quantity, floor plan requirement and destination country. We will help you compare product types and prepare a practical quotation direction.
Need Help?

Need Help Choosing The Right Modular Building System?

Product Consultation

Compare expandable, folding, flat-pack and detachable systems for your project.

Drawing & Layout Support

Send a sketch, floor plan or reference image for layout discussion.

Export & Loading Support

Get packing, container loading and shipment preparation guidance.